Maintenance Contracts
What an annual maintenance contract actually covers
Three tiers and one inclusion matrix, so you can see the difference before anyone quotes you. Comprehensive covers parts and labour; non-comprehensive covers labour with parts at actuals; on-call has no annual commitment.
15,000+ computers maintained under contract across Telangana and Andhra Pradesh
01Choose a tier
Three ways to hold cover
Which one suits you depends on how much of the parts budget you want to keep visible, and how quickly a failed machine needs to be back in service.
Comprehensive AMC
Parts and labour both covered
The full contract. Failed parts are replaced from our stock, labour is included, and the machine goes back into service without a purchase approval in the middle of it.
- Replacement parts included
- All labour included
- Scheduled preventive maintenance visits
- Standby units held against breakdowns
- Asset register and service history maintained
- Priority response window
Best for: Fleets where a failed machine stops somebody's work today.
Non-Comprehensive AMC
Labour covered, parts at actuals
You keep control of the parts budget and we carry the engineering. Labour is included, on-site attendance is included, and parts are billed at actuals with the old component returned to you.
- All labour included
- On-site attendance included
- Parts billed at actuals and returned
- Scheduled preventive maintenance visits
- Asset register and service history maintained
Best for: Estates with an internal stores function, or where the parts spend must stay visible.
On-Call Support
No annual commitment
Pay per call, with no annual contract. Useful where the estate is small or the equipment is close enough to end of life that a multi-year commitment does not make sense.
- No annual commitment
- Per-incident attendance
- Cover on any brand we are authorised for
- Upgradeable to a contracted tier at renewal
Best for: Small sites, or organisations that want us on the list before they need us.
02Compare
Inclusion matrix
The same eight questions answered for every tier — including the follow-up question each row raises.
Scroll sideways to compare tiers
The response window, covered asset list and exclusions that apply to your site are stated in your own contract.
24×7 cover
Gold 24×7 Contract
Scantech's exclusive Gold Maintenance contract runs 24-hour cover all 365 days of the year, staffed by support engineers holding B.E. / B.Tech / MCA / BCA / B.Sc-IT qualifications with between 8 and 22 years of experience.
- 24-hour cover, all 365 days
- Response inside 1 hour for breakdown calls
- Resident engineer option at customer premises
- Standby units and a held spares pool
- Central helpdesk with logged escalation
03In plain language
The questions a contract always raises
What counts as a call-out
Any fault that stops a covered machine, device or link from doing its job — including one that only appears intermittently. Problems traced to a covered asset are a call-out; problems traced to an uncovered asset are quoted before work starts.
What is not covered
Physical damage, liquid ingress, electrical damage from a supply fault, unauthorised modification, and consumables. Anything excluded is named in the contract rather than discovered at the point of failure.
How renewals work
The asset register is re-surveyed before renewal, so equipment added or retired during the year is reflected in the next term rather than billed from an out-of-date schedule.
Taking over from another vendor
We survey the estate and build the asset register during handover — which routinely surfaces equipment the outgoing vendor's records did not include.
04Response
Priority levels and windows
Priority is agreed with you when the call is logged, so the window follows the incident rather than being decided afterwards.
Scroll sideways to compare tiers
Priority is agreed with you when the call is logged, so the window follows the incident rather than being decided afterwards.
Next step
Get a contract scoped against your actual estate
Send us the asset list, or ask for a survey and we will build it. The contract reflects the machines you own — not an estimate of what a site your size usually has.
A written scope with a bill of materials is issued before any commitment is made.
